Project Performance

Nan’ao LemenⅠoffshore wind farm pile testing project of Guangdong Datang International Power Generation Co. Limited

Nan’ao LemenⅠoffshore wind farm pile testing project of Guangdong Datang International Power Generation Co. Limited was still under construction in March 2019.

This project is to install one non-socket bored pile (which contains the installation of one 113-meter long testing pile, four 94-meter long anchor pile and two 80-meter long reference pegs).