Project period: August 2018 till now
Scope of work: wind turbine foundation construction and wind turbine installation
Project Profile: The project is located in Pinghai Bay, Putian, adjacent to Pinghai Peninsula in the West and Nanri Island in the north. Total capacity is about 250MW, among which, there are 20 turbines are located in the Area B, another 21 are located in Area C. The foundation construction of each wind turbine mainly includes the construction of pile-steady platform, auxiliary pile insertion, work platform installation and single pile (main pile) lifting, penetrating and piling, rock socketing and so on. The length of a single pile is 77 meters, and the weight is close to 1,000 tons. This project is the first offshore wind turbine foundation construction and installation project of Guangzhou Salvage.