Project Performance

CFD 11-1WHPA\11-6WHPD Platform Installation

Location:CFD 11-1WHPA\11-6WHPD Platform work site
Working Period:Oct to Dec, 2011
Main Introduction:
HTL had successfully lifted the 700 tons topside for the CFD 11-1WHPA on 28th October 2011.The work site is located beside an old module. The installation had to go through the Christmas tree and rows of pipes. In order to avoid those devices, it required HTL to perform the works as steadily as possible. This is difficult for a huge stuff like HTL to move steadily with a 700tons things hanging on it, especially on the sea. With our great experience, sharp judgment and good management, this topside was safely installed on its right place. On 24th November, HTL was mobilized to CFD11-6WHPD Platform work site and finished the platform installation safely and perfectly under the effort of our experienced project superintendent and captain. 

The client Kerr-McGee China Petroleum Limited gave high praise to the exceptional performance HTL had done and presented an Award of Excellence to HTL. This is the second time HTL was awarded by foreign company.