Project Performance

Wenchang 14-3A Jacket and Module Installation Project

 

Location: Wenchang 14-3A field is located in Pearl River Mouth Basin of Nanhai water in a water depth of approximately 122.9m.

 

Working Period: June 6 to July 16, 2008

 

Profile: 1. No. Of Legs: 4 Legged Jacket and 8 Skirt Piles

 

      2. Piles Dimension: dia. 2.134m ( 84”)

 

      3. Jacket Weight: 2992 tons

 

      4. Piles Weight: 2120 tons

 

      5. Module Weight: 2244 tons