Project Location: Guangao Port, Shantou, Guangdong Province
Project Period: May 2012 to currently
Project Description:
The contract sum for this project is 473 million, the length of the breakwater is 1843.3m, and sloping seawall with armor rock protection is deployed. Main contract works including: rock foundation, protection layer by Wang word twisting block, light beacon on top. This is a foundation project for further development of Guangao port, which is still on-going.
Project Features:
Shantou Guang'ao Breakwater Project is key project of the Ministry of Transport, and is one of the “the new ten projects of Guangdong Province”. The dredging volume is about 1.1 million m3, the amount of rock fill is 3 million m3, 25000 numbers of precast concrete units “Wang word twisting block ”including 3000 numbers of 32t units, 15000 numbers of 24t unit, and 7000 numbers of 12t unit."Explosive squeeze mud and replacement" method is deployed for foundation treatment, the max. depth of the mud replacement is 22m, the max. Quantity of rock filling replacement is 15000 m3.