Project Location: Yangjiang Port, Guangdong Province
Project Period: May 2009 to March 2010
Project Description:
The contract sum for this project is about 88 million. The total design berthing length of the two pubic piers is 510m;gravity caisson structure is deployed.Main construction works including: pre-casting, transportation and installation of precast concrete caisson units, concrete slabs, coping, installation of gantry rails and rubber fenders etc., and revetment berth, ground paving and ancillary facilities.
Project Features:
The berthing capacity for both piers is over 10 thousand tons, are made by 22 numbers of precast concrete caisson units, 1500t each. With well-organized, tight arrangements, and superb construction technology, we have successfully completed all construction works in time including pre-casting, transportation and installation of these heavy concrete caisson units with self-weight over one thousand ton each.