Project Performance

Foundation Treatment for Zhanjiang Port Container Terminal Baoman Service area project (Phase I)

Project Location: Zhanjiang Port, Guangdong Province
Project Period: December 2013 to currently
Project Description:
The contract sum for this project is 160 million.The foundation treatment area is 288484m2 for A, B and C construction zone, including foundation treatment works at both shallow layer and deep layer soil. The quantity for cleanup gypsum at surface layer is about 70 million m3, and the excavation quantity on land is about 30 million m3.
Project Features:
This project provides the solution for the settlement of soft foundation. The depth of the soft soil on site is upto 9m, the settlement of the foundation take long time to stable. We provide solution by deploying both flapper drainage consolidation and preloading method.