Project Location: Foshan City, Guangdong Province, PRC
Project Period: January 2010 to Jun 2011
Project Description:
We are the main contractor of this project, which contract sum is 95 million. New pier by piles & slabs structure which can accommodated two 5,000 ton bulk cargo ships are built for the Sanshui Hengyi power station 2 × 600MW supercritical coal-fired generating units, design annual capacity is 2.86 million MT. Main construction works including: Harbor Dredging, foundation trench excavation, pier platform , bridge approach, revetment, the upper part of the concrete structure, equipment installation, civil works and transport room drainage, environmental protection, power lighting, communications, automatic control, navigational aids and ventilation dust and other ancillary works.
Project Features:
This a supporting project for power plant, which encounter complicate geological condition, the most foundation is limestone. 1000mm Dia. PHC piles are deployed for foundation of main pier, while 1200mm bored piles are deployed for the approaching bridge. The design berth length is 255m, the width of pier platform is 22m, and the length of approaching bridge is 80m. Multilayer beams and slabs structure is designed for the pier platform due to great difference of water level between high tide and low tide. The most challenges of the construction works are the flood impact, short construction period, and high standard requirement with small tolerance for the installation of pier equipment.