Project Performance

Fuzhou Pingtan Dalian Wind Farm Project in Fujian Province

Project scope: main pile installation, the pile was 913 tons in weight, 78.6 meters in length, and 6.8 meters in diameter.

Features: HUA TIAN LONG released one end of the pile while lifting it breadthwise and when the end touched the seabed, upended the pile.