Location: Colombo, Sri Lanka
Construction Period: July 2013 – May 2015
Project Profile:
Remove sediments of whole length of the two sea outfalls which locate respectively at Mutwal and Wellawata in Colombo, Sri Lanka. Replace part of the old Mutwal sea outfall with DN1600 HDPE pipeline.
Highlight:
This is our first time acting as a main contractor in an international EPC project. The project staffs fought hard and overcame difficulties, creatively used self design desilting facilities and sonar inspection technology.