Location: Hochiminh City, Vietnam
Construction date: 2010
With length of 1.6 km,Hochiminh east west highway project is located in Hochiminh City, Vietnam .The immersed tunnel section of the project consists of 4 units with a length of 370.8 meters, a closure joint is applied at this project, Guangzhou Salvage is responsible for the transporting and immerse works of the tunnel units.